CTH A DALLAS ST over UPPER PINE CREEK

0.7M W JCT CTH U · County 005, Wisconsin · Built 2004 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
B03017200000000
Year Built
2004
Length
20.3 m (66.6 ft)
Max Span
9.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,200
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.