LRD MASTERSON FIRE over E FK CHIPPEWA RIVER

3.0M E JCT CTH N · County 003, Wisconsin · Built 2003 · 2 Lanes · 71 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
6
Satisfactory

Bridge Details

Structure #
B02005800000000
Year Built
2003
Length
20.3 m (66.6 ft)
Max Span
19.5 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
71
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.