STH 13 over CHIPPEWA RIVER 33
9.1M N JCT CTH F · County 003, Wisconsin · Built 1997 · 2 Lanes · 1,700 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
46.129464, -90.5674
This bridge is in worse condition than 95.2% of bridges in County 003. The average bridge in Wisconsin is 0 years old; this one is 29 years old.
Nearby Bridges
CTH N over E FK CHIPPEWA RIVER
Built 2011
LRD MANKENBURG RD over CHIPPEWA RIVER 34
Built 1988
LRD SINK HOLE RD ( over E FK CHIPPEWA RIVER
Built 2018
CTH N over E FK CHIPPEWA RIVER
Built 1990
LRD GEORGE BAY ROA over E FK CHIPPEWA RIVER
Built 1990
STH 13 over DRYDEN CREEK
Built 1997
LRD BAY RD over E FK CHIPPEWA RIVER
Built 1964
LRD GORDON LAKE RD over DRYDEN CREEK
Built 1988
LRD MACKENBERG-LEN over MAGEE CREEK
Built 1997
LRD PIEPER RD (DEA over CHIPPEWA RIVER 32
Built 2020
Bridge Details
- Structure #
- B02004700000000
- Year Built
- 1997
- Length
- 30.4 m (99.7 ft)
- Max Span
- 14.6 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,700
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $433,000
- Total Project Cost
- $650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.