FR 653 over SAILOR CREEK

7.8 miles SE of Fifield · County 099, Wisconsin · Built 2019 · 1 Lanes · 5 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
091301000031813
Year Built
2019
Length
6.2 m (20.3 ft)
Max Span
6.2 m
Lanes
1
Daily Traffic
5
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.