LRD CENTRAL AVE (D over S FK FLAMBEAU RIVER
0.6M S JCT STH 70 · County 099, Wisconsin · Built 1979 · 2 Lanes · 50 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 5 | Fair |
Location
45.872361, -90.420944
This bridge is in worse condition than 74.8% of bridges in County 099. The average bridge in Wisconsin is 0 years old; this one is 47 years old.
Nearby Bridges
LRD BALSAM ST over S FK FLAMBEAU RIVER
Built 1998
STH 70 over S FK FLAMBEAU RIVER
Built 1951
STH 13 over S FK FLAMBEAU RIVER
Built 1972
LRD DIVINE RAPIDS over S FK FLAMBEAU RIVER
Built 1988
LRD OLD 13 ROAD over SAILOR CR
Built 2010
STH 4TH ST over N FK FLAMBEAU RIVER
Built 1973
CTH B over FLAMBEAU RIVER
Built 1971
STH 182 over NORTH FORK FLAMBEAU RIVE
Built 2017
FR 136 over SAILOR CREEK
Built 2010
CTH E over SMITH CREEK
Built 2007
Bridge Details
- Structure #
- B50003400000000
- Year Built
- 1979
- Length
- 33.5 m (109.9 ft)
- Max Span
- 16.3 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.