FR 153 over WEST FORK HAY CREEK

NO DATA ENTERED · County 099, Wisconsin · Built 2001 · 2 Lanes · 99 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
091301000003081
Year Built
2001
Length
9.3 m (30.5 ft)
Max Span
8.9 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
99
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$105,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.