I-77 NBL over CR 21

8.37 MILES S OF WV 14 · County 107, West Virginia · Built 1968 · 2 Lanes · 5,950 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000054A115
Year Built
1968
Reconstructed
1998
Length
52.2 m (171.3 ft)
Max Span
22.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
5,950
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.