I-77 NBL over CR 21/31

1.32 MI S OF CR 21 · County 107, West Virginia · Built 1968 · 2 Lanes · 4,550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000054A113
Year Built
1968
Length
48.8 m (160.1 ft)
Max Span
18.8 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
4,550
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.