COUNTY ROUTE 38/5 over BADGLEY FORK

0.16 MI W OF CR 21/17 · County 107, West Virginia · Built 1924 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000054A089
Year Built
1924
Length
8.1 m (26.6 ft)
Max Span
7.9 m
Width
5.4 m (17.7 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$350,000
Total Project Cost
$450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.