I 77 over CR 21/21

0.90 MI S of WV 14 · County 107, West Virginia · Built 2017 · 4 Lanes · 12,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
00000000054A258
Year Built
2017
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
36.6 m (120.1 ft)
Lanes
4
Daily Traffic
12,800
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.