COUNTY ROUTE 3/2 over STANDINGSTONE CREEK

0.02 M SOUTH OF CR 53/3 · County 105, West Virginia · Built 1981 · 1 Lanes · 20 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
00000000053A045
Year Built
1981
Length
15.9 m (52.2 ft)
Max Span
15.6 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
20
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$450,000
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.