COUNTY ROUTE 3/4 over STANDINGSTONE CREEK

0.03 MILE WEST OF CR 3 · County 105, West Virginia · Built 1951 · 2 Lanes · 10 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
00000000053A005
Year Built
1951
Length
10.4 m (34.1 ft)
Max Span
9.8 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$400,000
Total Project Cost
$450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.