COUNTY ROUTE 23 over LEFT HAND CREEK

0.01 mi. north of US 119 · County 087, West Virginia · Built 2012 · 2 Lanes · 400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000044A171
Year Built
2012
Length
31.2 m (102.4 ft)
Max Span
30.5 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$700,000
Total Project Cost
$800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.