I-79 SB over US 119 & LEFT HAND FORK

1.27 MILES NORTH OF CR 53 · County 039, West Virginia · Built 2012 · 2 Lanes · 23,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
00000000020A853
Year Built
2012
Length
104.9 m (344.2 ft)
Max Span
39 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
23,100
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.