WEST VIRGINIA 2 over Power Plant Access Rd.

0.40 M SOUTH OF C.R. 2/11 · County 073, West Virginia · Built 1977 · 2 Lanes · 7,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000037A025
Year Built
1977
Length
39.6 m (129.9 ft)
Max Span
15.2 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
7,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$325,000