COUNTY ROAD 20 over LONG RUN * HAYNE

3.76 MI NE OF JCT SR 7 · County 167, Ohio · Built 1983 · 2 Lanes · 252 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
8431736
Year Built
1983
Length
10.5 m (34.4 ft)
Max Span
8.8 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
252
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.