C R 522/10 SLS over WARM SPRING RUN

0.02 MI EAST OF US 522 F · County 065, West Virginia · Built 1945 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
00000000033A054
Year Built
1945
Length
8.9 m (29.2 ft)
Max Span
8.1 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$220,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.