CR 2/3 SLS over WARM SPRING RUN

0.04 MI N OF CR 02 SLS · County 065, West Virginia · Built 1927 · 2 Lanes · 150 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
00000000033A048
Year Built
1927
Length
7.8 m (25.6 ft)
Max Span
6.9 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$60,000
Total Project Cost
$65,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.