COUNTY ROUTE 8 over BALLARD HARMON BRANCH

0.05 MILE NORTH OF CO 8/1 · County 047, West Virginia · Built 2007 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000024A312
Year Built
2007
Length
11.6 m (38.1 ft)
Max Span
10.4 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$450,000
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.