CO 8 over BALLARD HARMON BRANCH

0.23 MI N OF CR 8/2 · County 047, West Virginia · Built 1991 · 2 Lanes · 200 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000024A048
Year Built
1991
Length
14.8 m (48.6 ft)
Max Span
12.2 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$400,000
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.