I-77 over Route 61

0.89 MI S OF WV61 · County 039, West Virginia · Built 1983 · 4 Lanes · 35,546 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000020A633
Year Built
1983
Length
76.9 m (252.3 ft)
Max Span
30.2 m
Width
27.6 m (90.6 ft)
Lanes
4
Daily Traffic
35,546
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.