US 60 E&W EX RAMP over GEORGES CREEK

0.56 MI E OF CR 73 · County 039, West Virginia · Built 1945 · 5 Lanes · 30,900 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
00000000020A156
Year Built
1945
Length
8.6 m (28.2 ft)
Max Span
4.1 m
Lanes
5
Daily Traffic
30,900
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.