I-77 NB & SB over US 60

1.35 MI N of US 60 (T) · County 039, West Virginia · Built 1975 · 4 Lanes · 47,700 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
00000000020A424
Year Built
1975
Length
148.1 m (485.9 ft)
Max Span
37.2 m
Width
27.6 m (90.6 ft)
Lanes
4
Daily Traffic
47,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.