I-77 NB R CR 60/62 over I77S NSRR CR64/4 CR60/76

0.42 MI. N. OF WV 61 · County 039, West Virginia · Built 1975 · 1 Lanes · 7,424 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
00000000020A362
Year Built
1975
Length
120.1 m (394 ft)
Max Span
34 m
Width
8.3 m (27.2 ft)
Lanes
1
Daily Traffic
7,424
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$450,000
Total Project Cost
$490,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.