CR 59 over BIG SANDY CREEK

0.01 MI N OF US 119 · County 039, West Virginia · Built 1977 · 2 Lanes · 1,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
00000000020A140
Year Built
1977
Length
53.4 m (175.2 ft)
Max Span
19.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.