CR 9/19 SLS over WV 9 (X)

0.42 MI S OF CR 9/26 SLS · County 003, West Virginia · Built 2010 · 2 Lanes · 70 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000002A149
Year Built
2010
Length
55.2 m (181.1 ft)
Max Span
54.3 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
70
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.