WV 09 (X) WB over CR 9/19 (SLS)

0.24 MI E OF CR 9/19 SLS · County 003, West Virginia · Built 2010 · 3 Lanes · 12,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000002A148
Year Built
2010
Length
38.1 m (125 ft)
Max Span
36.4 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
12,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.