SPILLWAY BRIDGE over SPILLWAY CHANNEL

LOWER GRANITE DAM · County 023, Washington · Built 1968 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
CEPNPWWA0LGRSPY
Year Built
1968
Length
156 m (511.8 ft)
Max Span
19.5 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$145,000
Total Project Cost
$218,000