SOUTH SHORE BRIDGE over SOUTH SHORE ACCESS

LOWER GRANITE DAM · County 023, Washington · Built 1973 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
CEPNPWWA0LGRSAR
Year Built
1973
Length
224.7 m (737.2 ft)
Max Span
24.9 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$1,453,000
Total Project Cost
$2,180,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.