112TH AVE SE over SOUND TRANSIT LIGHT RAIL

0.4 Mi N of Bellevue Way · County 033, Washington · Built 2023 · 4 Lanes · 500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089477000000000
Year Built
2023
Length
94.5 m (310 ft)
Max Span
9.8 m
Width
25 m (82 ft)
Lanes
4
Daily Traffic
500
Material
Concrete
Design
Slab
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$9,424,000
Total Project Cost
$18,848,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.