RAMP over COLLECTOR DISTRIBUTOR

2.4 N JCT I-90 · County 033, Washington · Built 2004 · 2 Lanes · 10,323 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0016549C0000000
Year Built
2004
Length
114 m (374 ft)
Max Span
7.7 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
10,323
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,820,000
Total Project Cost
$7,641,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.