SBCD RAMP over COLLECTOR DISTRIBUTOR
2.4 N JCT I-90 · County 033, Washington · Built 2004 · 1 Lanes · 8,340 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.615111, -122.189167
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 22 years old.
Nearby Bridges
NE 6TH ST over 114TH AVE NE I-405
Built 2004
NE 4TH ST over CITY STREET AND SBCD
Built 1989
NE 4TH ST over I-405
Built 2003
NE 4TH STREET over I-405
Built 1987
RAMP over COLLECTOR DISTRIBUTOR
Built 2004
NE 8TH ST over I-405
Built 2003
NE 4th St over Stormwater Facility
Built 2013
NE 10TH STREET over I-405
Built 2009
N-E RAMP over CD RAMP AND TERRAIN
Built 2011
MAIN ST over I-405
Built 2023
Bridge Details
- Structure #
- 0016549D0000000
- Year Built
- 2004
- Length
- 148.7 m (487.9 ft)
- Max Span
- 9.1 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 1
- Daily Traffic
- 8,340
- Material
- Prestressed Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,245,000
- Total Project Cost
- $6,490,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.