Pacific Avenue N. over BNSF railroad
1.15 SW I-5 Exit 42 · County 015, Washington · Built 2023 · 2 Lanes · 1,300 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.173889, -122.907222
This bridge is in worse condition than 11.8% of bridges in County 015. The average bridge in Washington is 0 years old; this one is 3 years old.
Nearby Bridges
PACIFIC AVE NORTH over BNRR
Built 1994
I-5 over C&C RY & COUNTY RD
Built 1976
I-5 over C&C RY & N PACIFIC AVE
Built 1976
LEXINGTON BR.DRIV over COWLITZ R. AND BNSF RR
Built 2007
INGLEWOOD DR over WESTOVER CREEK
Built 1997
LEXINGTON BR DR over I-5
Built 1975
HOLCOMB RD over C&C RAILROAD
Built 1968
NEVADA DR over WESTOVER CREEK
Built 2000
I-5 over KELSO AVE (OLD SR 431)
Built 1979
I-5 over KELSO AVE (OLD SR 431)
Built 1980
Bridge Details
- Structure #
- 089384000000000
- Year Built
- 2023
- Length
- 33.5 m (109.9 ft)
- Max Span
- 32.9 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,166,000
- Total Project Cost
- $4,332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.