Pacific Avenue N. over BNSF railroad

1.15 SW I-5 Exit 42 · County 015, Washington · Built 2023 · 2 Lanes · 1,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089384000000000
Year Built
2023
Length
33.5 m (109.9 ft)
Max Span
32.9 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
1,300
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,166,000
Total Project Cost
$4,332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.