LEXINGTON BR DR over I-5
2.8 N JCT SR 4 · County 015, Washington · Built 1975 · 2 Lanes · 6,191 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.184097, -122.897403
This bridge is in worse condition than 23% of bridges in County 015. The average bridge in Washington is 0 years old; this one is 51 years old.
Nearby Bridges
LEXINGTON BR.DRIV over COWLITZ R. AND BNSF RR
Built 2007
HOLCOMB RD over C&C RAILROAD
Built 1968
PLEASANT HILL RD over I-5
Built 1975
I-5 over C&C RY & N PACIFIC AVE
Built 1976
I-5 over C&C RY & COUNTY RD
Built 1976
PACIFIC AVE NORTH over BNRR
Built 1994
I-5 & PACIFIC AVE over OSTRANDER CREEK
Built 1965
Pacific Avenue N. over BNSF railroad
Built 2023
OSTRANDER RD over OSTRANDER CREEK
Built 1962
OSTRANDER RD over OSTRANDER CREEK
Built 2023
Bridge Details
- Structure #
- 0009597C0000000
- Year Built
- 1975
- Length
- 95.1 m (312 ft)
- Max Span
- 32.9 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 6,191
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,482,000
- Total Project Cost
- $6,965,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.