Vantage Hwy over Cascade Canal

MP 5.25 Vantage Hwy · County 037, Washington · Built 2023 · 2 Lanes · 3,979 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089368000000000
Year Built
2023
Length
15.2 m (49.9 ft)
Max Span
12.8 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
3,979
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,083,000
Total Project Cost
$2,166,000