S MAIN ST over I-90

4.6 E JCT I-82 · County 037, Washington · Built 1968 · 2 Lanes · 2,071 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008386A0000000
Year Built
1968
Length
86.9 m (285.1 ft)
Max Span
29 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
2,071
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,520,000
Total Project Cost
$7,040,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.