CRUMB ROAD over HIGHLAND CREEK

0.17 NW JCT HWY 12 · County 041, Washington · Built 2022 · 2 Lanes · 15 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
089331000000000
Year Built
2022
Length
8.9 m (29.2 ft)
Max Span
8.9 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
15
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$256,000
Total Project Cost
$511,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.