TEMPLE ROAD over DAVIS CREEK

1.0 SE MORTON · County 041, Washington · Built 1990 · 2 Lanes · 53 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 6 Satisfactory

Location

46.550181, -122.262689

This bridge is in worse condition than 50.7% of bridges in County 041. The average bridge in Washington is 0 years old; this one is 36 years old.

Nearby Bridges

Bridge Details

Structure #
085743000000000
Year Built
1990
Length
9.9 m (32.5 ft)
Max Span
9.1 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
53
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$767,000
Total Project Cost
$1,534,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.