OCR 3683 over NESPELEM RIVER

5.1 mi N. SR 155 · County 047, Washington · Built 2022 · 2 Lanes · 51 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089299000000000
Year Built
2022
Length
21.6 m (70.9 ft)
Max Span
20.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
51
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$506,000
Total Project Cost
$1,012,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.