OCR 3683 over NESPELEM RIVER

5.13 NO. JCT. SR 155 · County 047, Washington · Built 2017 · 2 Lanes · 44 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
088928000000000
Year Built
2017
Length
21.3 m (69.9 ft)
Max Span
20.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
44
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,444,000
Total Project Cost
$2,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.