LAMAR RD over WINNETT CANYON
02.79 E OF SR 124 · County 071, Washington · Built 2022 · 2 Lanes · 86 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.290167, -118.534639
This bridge is in worse condition than 7.2% of bridges in County 071. The average bridge in Washington is 0 years old; this one is 4 years old.
Nearby Bridges
SR 124 over WINNETT CANYON
Built 1966
HARVEY SHAW RD over TOUCHET RIVER
Built 2005
SR 124 over COUNTY RD
Built 1962
GREENVILLE RD over WINNETT CANYON
Built 1986
LYONS FERRY RD over WINNETT CANYON
Built 1988
SR 124 over ABANDONED RAILROAD
Built 1966
LUCKENBILL RD over DRY RUN
Built 2012
LUCKENBILL RD over TOUCHET RIVER
Built 1998
PETTYJOHN RD over TOUCHET RIVER
Built 1914
MCFEELY RD over WINNETT CANYON
Built 1951
Bridge Details
- Structure #
- 089285000000000
- Year Built
- 2022
- Length
- 26.8 m (87.9 ft)
- Max Span
- 25.9 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 86
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,769,000
- Total Project Cost
- $3,538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.