SR 124 over WINNETT CANYON

25.2 E JCT US 12 · County 071, Washington · Built 1966 · 2 Lanes · 1,622 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008008A0000000
Year Built
1966
Length
46.9 m (153.9 ft)
Max Span
18.6 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
1,622
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,316,000
Total Project Cost
$2,633,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.