Main ST over Stormwater Facility

0.01 W JCT 151 PL · County 033, Washington · Built 2021 · 1 Lanes · 13,683 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
089280000000000
Year Built
2021
Length
27.1 m (88.9 ft)
Max Span
4.9 m
Width
4.1 m (13.5 ft)
Lanes
1
Daily Traffic
13,683
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,222,000
Total Project Cost
$2,445,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.