NE 12TH ST over PARKING LOT
NE 12TH & 124TH NE · County 033, Washington · Built 1971 · 5 Lanes · 18,028 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.620047, -122.176722
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 55 years old.
Nearby Bridges
120th Ave NE over Stormwater Facility
Built 2016
120TH AVE NE over SOUND TRANSIT LIGHT RAIL
Built 2017
NE SPRING BLVD over SOUND TRANSIT LIGHT RAIL
Built 2017
124TH AVE NE over SOUND TRANSIT LIGHT RAIL
Built 2019
NE 12TH ST over BNRR
Built 1970
NE SPRING BLVD over SOUND TRANSIT LIGHT RAIL
Built 2017
124th Ave SE over Storwater Facility
Built 2021
NE Spring Blvd over Stormwater Facility
Built 2018
124 NE AVE NE over West Tributary
Built 2024
N-E RAMP over CD RAMP AND TERRAIN
Built 2011
Bridge Details
- Structure #
- 085472000000000
- Year Built
- 1971
- Length
- 86 m (282.2 ft)
- Max Span
- 16.5 m
- Width
- 21.9 m (71.9 ft)
- Lanes
- 5
- Daily Traffic
- 18,028
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,264,000
- Total Project Cost
- $20,528,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.