CRYSTAL MNT BLVD over SILVER CREEK

4.67 E JCT 410 · County 053, Washington · Built 2016 · 2 Lanes · 675 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
088948000000000
Year Built
2016
Length
9.8 m (32.2 ft)
Max Span
9.8 m
Width
30.5 m (100.1 ft)
Lanes
2
Daily Traffic
675
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$638,000
Total Project Cost
$1,277,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.