CRYSTAL MNT BLVD over SILVER CREEK

3.4 E JCT SR410 · County 053, Washington · Built 2015 · 2 Lanes · 675 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
088947000000000
Year Built
2015
Length
9.8 m (32.2 ft)
Max Span
9.8 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
675
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$638,000
Total Project Cost
$1,277,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.