NW BUCKLIN HILL RD over CLEAR CREEK

0.3 E SILVERDALE WAY · County 035, Washington · Built 2016 · 4 Lanes · 17,013 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
088911000000000
Year Built
2016
Length
73.2 m (240.2 ft)
Max Span
22.9 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
17,013
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,420,000
Total Project Cost
$6,840,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.