SILVERDALE WAY over CLEAR CREEK

0.1 N JCT SR 303 · County 035, Washington · Built 2006 · 2 Lanes · 14,071 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
087537000000000
Year Built
2006
Length
17.7 m (58.1 ft)
Max Span
15.2 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
14,071
Material
Prestressed Concrete Continuous
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$524,000
Total Project Cost
$1,047,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.