Mahoney Road over Cowiche Creek N. Fork

0.1 E Pioneer Way · County 077, Washington · Built 2016 · 2 Lanes · 93 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
088867000000000
Year Built
2016
Length
12.2 m (40 ft)
Max Span
11.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
93
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$902,000
Total Project Cost
$1,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.