THOMPSON ROAD over COWICHE CREEK N. FORK
00.36 E ELLIOT ROAD · County 077, Washington · Built 1951 · 2 Lanes · 991 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
46.657719, -120.692222
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 75 years old.
Nearby Bridges
SUMMITVIEW ROAD over COWICHE CREEK S. FORK
Built 1958
PIONEER WAY N. over COWICHE CREEK
Built 1987
Mahoney Road over Cowiche Creek N. Fork
Built 2016
Pioneer Way over Cowiche Creek
Built 2014
PIONEER WAY over DRY WASH
Built 1998
WEIKEL ROAD over COWICHE CREEK
Built 1950
ZIMMERMAN ROAD over COWICHE CREEK
Built 1965
Forney Road over Cowiche Creek
Built 2019
COWICHE MILL ROAD over CANAL - ABANDONED
Built 1957
US 12 over PACIFIC P L TAILRACE
Built 1969
Bridge Details
- Structure #
- 084688000000000
- Year Built
- 1951
- Length
- 11.6 m (38.1 ft)
- Max Span
- 4.3 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 991
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $866,000
- Total Project Cost
- $1,733,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.